Quality Control

Quality assurance, defect tracking, and continuous improvement

Tuesday, December 23, 2025
03:48 PM
VM
Overall Quality Rate
96.2%
+1.8%
First-time quality rate
Defect Rate (PPM)
2,850
-12.5%
Parts per million defects
Active Quality Issues
4
+33%
Issues requiring attention
PPAP Compliance
94.5%
+2.1%
Production Part Approval Process

Defect Rate Trend

Defect Categories

Assembly Issues
45 defects
Material Defects
38 defects
Welding Problems
25 defects
Paint Defects
18 defects
Other
15 defects

Quality Incidents

IDTypeModelSeverityStatusActions
QI-2024-001Critical DefectSedan X1HighOpen
QI-2024-002Process DeviationSUV Y2MediumInvestigating
QI-2024-003Material IssueTruck Z3HighResolved
QI-2024-004Assembly ErrorElectric E1MediumOpen

Inspection Stations

Incoming Materials
Good
Pass Rate
98.2%
Inspected
2,450
Defects
43
Frame Assembly
Good
Pass Rate
96.8%
Inspected
1,850
Defects
58
Engine Installation
Good
Pass Rate
97.5%
Inspected
1,620
Defects
41
Paint Quality
Warning
Pass Rate
94.3%
Inspected
1,580
Defects
91
Electrical Systems
Good
Pass Rate
98.7%
Inspected
1,420
Defects
18
Final Inspection
Warning
Pass Rate
95.1%
Inspected
1,380
Defects
67

PPAP Management

PPAP-001
Approved
SteelCorp
Frame Rails
Due: 2024-02-20100%
PPAP-002
In Review
EngineMfg
Engine Block
Due: 2024-02-2585%
PPAP-003
Submitted
WireTech
Harness Assembly
Due: 2024-03-0170%
PPAP-004
Draft
PaintCo
Paint System
Due: 2024-03-1030%