Maintenance Management
Equipment maintenance, preventive maintenance, and asset management
Tuesday, December 23, 2025
03:48 PM
VM
Equipment Availability
91.4%
+1.2%
Average uptime across all equipment
Maintenance Costs
$73K
-2.1%
Monthly maintenance expenditure
MTBF
1,010
+85
Hours between failures
PM Compliance
94.7%
+3.1%
Preventive maintenance completion rate
Maintenance Cost Trends
Predictive Maintenance Alerts
Assembly Robot A1
Vibration levels above threshold
Medium
Confidence: 85%
Predicted: 2024-03-01
Paint Booth B2
Temperature sensor indicating overheating
High
Confidence: 92%
Predicted: 2024-02-25
Welding Station C3
Power consumption trending upward
Low
Confidence: 68%
Predicted: 2024-03-15
Conveyor System E5
Bearing wear detected - immediate attention required
Critical
Confidence: 95%
Predicted: 2024-02-20
Maintenance Schedule
| Work Order | Equipment | Type | Priority | Scheduled | Status | Actions |
|---|---|---|---|---|---|---|
| MNT-001 | Assembly Robot A1 | Preventive | High | 2024-02-18 | Scheduled | |
| MNT-002 | Paint Booth B2 | Predictive | Medium | 2024-02-20 | In Progress | |
| MNT-003 | Welding Station C3 | Corrective | Critical | 2024-02-15 | Completed | |
| MNT-004 | Quality Scanner D4 | Preventive | Low | 2024-02-22 | Scheduled | |
| MNT-005 | Conveyor System E5 | Predictive | High | 2024-02-19 | Overdue |
Equipment Registry
| Equipment | Category | Availability | MTBF | Next Maint. | Actions |
|---|---|---|---|---|---|
| Assembly Robot A1 | Robotics | 95% | 1200h | 2024-02-18 | |
| Paint Booth B2 | Finishing | 92% | 950h | 2024-02-20 | |
| Welding Station C3 | Fabrication | 88% | 800h | 2024-02-25 | |
| Quality Scanner D4 | Quality | 97% | 1500h | 2024-02-22 | |
| Conveyor System E5 | Material Handling | 85% | 600h | 2024-02-19 |