Assembly Line Management
Real-time assembly line monitoring, performance tracking, and process optimization
Tuesday, December 23, 2025
03:48 PM
VM
Active Lines
3/4
75%
Lines currently operational
Average Efficiency
94.3%
+1.2%
Across all active lines
Total Output Today
356
+8.5%
Units produced today
Quality Issues
1
+100%
Active issues requiring attention
Real-Time Efficiency
Line Status Overview
Sedan Line
Running
145/150
units today
Efficiency
96%
Cycle Time
28min
Operators
12
SUV Line
Running
118/120
units today
Efficiency
92%
Cycle Time
32min
Operators
15
1 issue requiring attention
Truck Line
Maintenance
0/80
units today
Efficiency
0%
Cycle Time
45min
Operators
8
Electric Line
Running
93/95
units today
Efficiency
97%
Cycle Time
35min
Operators
10
Operator Performance
John Smith
Sedan Line
98% efficiency
145 tasks • 26min avg
Sarah Johnson
Sedan Line
95% efficiency
142 tasks • 28min avg
Mike Davis
SUV Line
92% efficiency
118 tasks • 31min avg
Lisa Wilson
SUV Line
94% efficiency
115 tasks • 30min avg
Tom Anderson
Electric Line
97% efficiency
93 tasks • 33min avg
Quality Checkpoints
Frame Assembly
Sedan Line • Inspector: Quality Team A
Pass
Last: 08:45
Engine Installation
Sedan Line • Inspector: Quality Team B
Pass
Last: 09:15
Paint Quality
SUV Line • Inspector: Quality Team C
Warning
Last: 09:30
1 defect
Electrical Systems
Electric Line • Inspector: Quality Team D
Pass
Last: 08:50
Final Inspection
Truck Line • Inspector: N/A
Maintenance
Last: N/A
Production Controls
Sedan Line
SUV Line
Truck Line
Electric Line